A precast pit, an in-situ pit, a pipe, an endwall and foundations are each an element, with their own hold points and their own record. Layers are defined in the ITP with their own ITRs, which puts every result against the layer it came from.

Unit: the element Layers defined in the ITP ITP · conformance · as-built
The unit of record

Why the record hangs off the element

Civil work is built as things. A precast pit, an in-situ pit, a pipe, an endwall, foundations. Each one is set out, built and accepted on its own, and when one is wrong it is that one that gets held.

Layers go through the ITP. A layer can be defined with its own ITRs, which gives greater clarity to every result and test than holding several of them under one lot does.

The identifier is on the drawing before any software is involved, and everything captured against the element is owned by it. Work can still be claimed in lots where the contract asks for that. The record stays on the element.

Hold points

A hold point is a point you nominate on the ITP, not a fixed idea the software brought with it. Work does not move past one until it is signed, and the register shows which are open and which were bypassed.

Excavation and bedding acceptance Pre-pour inspection Proof roll before next layer
The evidence

What gets recorded against the element

  • ITP and ITRs
    A prebuilt ITP to start from, with the required ITRs modified to suit the project. Any other ITR is built in the form builder or mapped from the form you already use. The Client's requirements or your own QMP set what has to be inspected, not the software.
  • Layers in the ITP
    A layer is defined in the ITP with its own ITRs. Every result and every test attaches to the layer it was taken on, which is where the clarity comes from.
  • Hold accountability
    A bypassed hold point cannot be backdated. If work went past a hold without its sign-off, the record says so and says when. On paper, in a spreadsheet or in a generic checklist module, the date is a field somebody types.
  • Pour record
    For concrete elements, a digital pour record behind the work: what was delivered, what was tested, and the reconciliation between the two. One pour covers several elements and attaches to each of them.
  • Redline mark-ups
    Align your drawing and upload a DXF. The redline mark-ups come out of it.
  • Defects and NCRs
    A defect is raised from the field, triaged immediately in the admin portal, and added to a live-link job pack. The rework and the retest sit against the same element, under the same non-conformance.
  • Conformance record
    An element's conformance record comes out of what is already held against it, and each accepted record lands in the handover set as it is signed.
Inside a precast box culvert underpass looking towards the opening
The register

One row per element

Element register, extract Illustrative
Swipe the table to see all columns →
Element Type Chainage Record Hold ITRs Status
PIT-0142 Precast pit 1240 PR-0318 Signed 7 of 7 Conformed
PIT-0143 In-situ pit 1355 PR-0318 Bypassed 11 Jun 5 of 7 NCR open
PIPE-0461 Pipe run 1240 to 1355 TR-0184 Signed 6 of 6 Conformed
EW-0088 Endwall 1355 PR-0321 Signed 6 of 6 Open
FND-0207 Foundations 1410 PR-0321 Signed 8 of 8 Open
PIT-0144 Precast pit 1480 Not placed Open 0 of 7 At hold point
6 of 2,640 elements · filter by any tag, ITR status, hold point or NCR
Against a PM platform

What the programme view cannot answer

Your project management platform has a task called drainage. It has a start, a finish, a percent complete and a crew against it. For a programme that is the right level of detail. Someone has to know whether the job is tracking, and a bar on a chart answers that.

It is the wrong level for the superintendent's question, which is never about drainage. It is about PIT-0143. Which results came back and what they said. Whether its hold was signed, and by whom. Why it is still open and what closes it. The conformance record for that element has to be produced out of those records, and a percentage does not contain them.

None of this is a criticism of the platform. It keeps the programme, and the programme moves on once the trench is closed. What was covered cannot be re-inspected, and the element's own record is the only thing that outlives the backfill.

With the element as the unit

  • PIT-0143's failed result, the non-conformance and the retest
  • That its hold was bypassed, and the day it happened
  • Which of a layer's ITRs are signed, held against that layer
  • The conformance record for an element, out of its own records
  • Every element still holding up the work in front of it

With the task as the unit

  • "Drainage, 68% complete"
  • An element register in a spreadsheet beside the platform
  • Laboratory certificates filed by date, not by element
  • A hold signed off last Tuesday, typed in this morning
  • Redlines marked up by hand on a printed drawing
Handover

The handover set the contract already asked for

A live handover set is not a nice-to-have. Most contracts of any size already require the conformance record to be built up as the work proceeds, rather than assembled once the work is done. Many do not work that way. The records exist, in folders, on phones, in the laboratory's reports, and the last month of the job goes on collecting them. FOC Capture tracks every record against its element and its tags from the beginning, so what you hand over is comprehensive rather than reassembled. It is added to the set as it is signed, and the tool compiles the Manufacturer's Data Report the same way where the contract asks for one. Either way it takes that work off the end of the job.

The same requirements expect a record to still be findable long afterwards, by someone who was not there when it was made. The ISO 19650 container convention was written to answer that, by making the name itself say what the record is. FOC Capture names the records it generates, built from the job data rather than typed: the project, the document type, the author and the revision are all in the name. It does not rename anything you bring. Drawings already numbered to the client's scheme keep those numbers: confirm one and the as-built honours it. The identity never changes once it is assigned. Only the status and revision move, from work in progress through sign-off to the locked as-constructed record. The client's information manager gets names their system recognises on sight.

Container codes this work uses

ERW Earthworks. The system code for excavation, fill and subgrade
DRN Drainage, for pits, pipes and endwalls
PAV Pavement, where the element is a pavement layer
CON Concrete works, where the record is about the pour itself
IT The element's inspection and test record
PR The digital pour record behind a concrete element
SV Survey, set-out and level records against the element
NC A non-conformance raised against an element
AB The as-built record at handover

Every element,
its own record.

FOC Capture runs the ITP, the hold points, the inspection forms you shape and the loops that close behind them, on the job, in the site office, and offline when the connection drops. Integrated with your own Google Drive. Your records stay readable without us. Enterprise adds hosted storage with a minimum retention period and an immutable record, and is not open for sign-up yet. Open formats, no lock-in.