Interactive demo Seven steps, on your own element schedule
Step 01 of 07

Start with the schedule you already have

Most jobs already have an element schedule in Excel. FOC Capture takes it as is: no template to fill in, no re-keying.

Drop your spreadsheet into the import box, or use the sample schedule.
No file handy?
Drop your element schedule here
.csv or .xlsx · your file and its contents stay in this page, unless you ask us to carry the project over on the last step.

To work out what your columns are for, we send anonymous per-column statistics, with no headers and no cell values, and keep them to improve the detector. What we send and keep, in full.

Column mapping 0 of 0 mapped
Identity · who the element is Tag · what you filter and group by Attribute · a fact shared by the group Value · read straight off the row Ignored · not imported
ABC DE 43 21 N C-201 GROUND FLOOR PRECAST REV C 1:100 @ A1
Precast panel Footing Grade beam Butt weld

Georeference

Control 1
Not set
Control 2
Not set
Grid spacing
8.000 m
Scale
Not set
Rotation
Not set
Residual
Not set
Elements plotted
0 of 240
C-201 · Ground floor precast layout · Rev C Georeferenced
Selected: 0 of 240 elements · nothing referenced to C-201 yet
0Elements carrying the tag
0Inspection steps generated
0Hold points created
0Witness points created
Apply the ITP to one of your tags
Choose an ITP in step 5 first.
07:14 78%
Offline
Stored on the device Will sync when signal returns
Setup complete

That is the whole loop

One spreadsheet in, tags and attributes confirmed, one ITP written once and applied to a tag. That is the whole setup, and on a real job it is the same seven steps you just did.

Elements imported
0
Tags
0
Attributes
0
Pending hold points
0
Pending witness points
0
What the real product writes
CSV · JSON · PDF

Integrated with your own Google Drive. Your records stay readable without us. Enterprise adds hosted storage with a minimum retention period and an immutable record, and is not open for sign-up yet.

This is the only point in the whole demo that your file itself is uploaded. It sends the file you dropped in and the column mapping you just confirmed to our servers, once, to set up your project. Back at import we sent anonymous per-column statistics, with no headers and no cell values; this is different, and this is the whole file. Finish the import and it is deleted immediately. If you do not, the link stops working a day after you click it, whether or not you sign up, and the file itself is deleted in our next daily cleanup. The full version of all of this is in our privacy policy.

Start a project
Every element from your schedule
ElementTagsAttributesPending
Activity