Every screen below is real. Captured on a project today — the Wooreen BESS Project, 671 structures, asbuilt records, ITPs, and reports running out of a single Google Drive workspace. No mockups, no fake data.

Captured June 2026 · FOC Capture Pro for Android
01

Set up in minutes

Sign in to your Google Drive, pick a workspace, create a project. All your contract, contractor, programme and geo detail lives with the project — no separate database to keep in sync.

9:41
Cloud Sync screen with Sign in to Google Drive
9:41
Google Drive Workspace showing Wooreen BESS Project
WorkspaceEvery project lives in your own Drive.
9:41
Create new project basic details Contract and client section Principal contractor and chainage section Programme dates, specification, latitude longitude timezone
Create new projectBasics · contract · contractor · programme & geo.
02

Capture in the field

Photos and documents tied to specific assets, tags and stages. Pre-pour, post-pour. Doc scan mode for paperwork that still arrives on paper.

9:41
Project view showing Photos tab with area chips and inspections
Project viewPhotos, ITPs, drawings, reports — one tap each.
9:41
Asset 1504 with Area 4 and Power Group 15 tags, pre-pour post-pour stages
Asset 1504Tags, stages, photos — everything in context.
9:41
Doc scan mode capturing a document for an asset
Doc scan modeScan oldschool straight into the new school. Dynamic tagging keeps everything in every place it needs to be .
03

Find anything fast

Search assets, tags and IDs across the whole project. Every detail of any asset from a single query.

9:41
Search for 1504 showing assets and drawings results
Search IDS or TagsFind their drawings and details
04

Inspections & test plans

Map the principal contractor's PDF forms, Autofill from project Metadata or build your own from a library. Templates carry your Elements I.D and inherit their data. .

9:41
ITP tab with PDF Forms library and Standard Foundation Inspection template
ITP templatesPDF forms + reusable inspection templates.
9:41
Template menu with Author template, Template library, Template drafts
Author templatesBuild, draft, browse the library.
05

Reports & sign-off

Toggle what goes in the report. Watch project progress in real time. Preview and sign once, then export the pack the principal asked for.

9:41
Report builder toggles for photos, ITP records, only completed ITPs, empty items
Report builderPhotos, ITP records, asbuilt source data.
9:41
Project Progress modal showing 0 percent of 671 structures, Preview and Sign Report button
Project progressCompleted structures, preview & sign.
06

Project tools

Everything in one menu — selection manager, tag library, asbuilt setup, share links, comments inbox, orphan photo reconciliation, CSV import, zip export.

9:41
Project overflow menu with Selection manager, Manage tags, Project settings, Asbuilt setup, Author template, Share links, Import CSV, Export ZIP

Want a closer look?

We'll set you up with a beta account on a real project.

Register interest